Of the logbook shows that the following is carried out in the course of 2000:
24.02.2000 | 66500km | Forbro bottom + rack [clockwork]. |
Rear subframe lubricated. | ||
13.05.2000 | 68000km | Forbro and rear subframe lubricated. |
30.05.2000 | 68400km | Rear wheel bearings greased. |
24.07.2000 | 68800km | Left front wheel rent greased + upper ball |
Left front brake doenst. | ||
01.09.2000 | 69500km | New air filter left. |
New air filter right side. | ||
04.09.2000 | 69500km | Forbro bottom carry ball lubricated. |
12.09.2000 | 69700km | Oil change. Oil filter. + Malycote (???) |
Bagvogn greased. | ||
Rearend oil level OK. | ||
23.09.2000 | 70000km | Replaced radiator hose in the expansion tank → cool studs + coolant replaced (5 hours). |
2001
Of the logbook shows that the following is carried out during 2001:
09.01.2001 | 70500km | Forbro greased bottom + steering rack |
19.04.2001 | 71300km | Forbro + rear subframe lubricated. |
Brakes overhauled, and more. | ||
Front pads (psychic pilots) dismantled (???) | ||
23.05.2001 | 71700km | Car sight OK. |
13.06.2001 | 71800km | Dyserens + cooler seals. |
– | 72600km | Forbro lower lubricated. |
11.10.2001 | 73200km | Rear subframe greased + forbro + bottom rack.
|
2002
Of the logbook shows that the following is carried out during 2002:
19.01.2002 | 73150km | Oil levels rearend OK. Leaking? |
17.02.2002 | 74250km | Oil change. Oil filter + Malycote (???) 125ccm. |
19.03.2002 | 74250km | Forbro upper + lower + tooth pole greased. |
Rear subframe + shaft drive [clockwork]? | ||
Petrol’s + cooler seals. | ||
02.04.2002 | – | 6 spark plug wires A-row measured approx. ≥ 5kΩ. OK. |
20.05.2002 | 75500km | Right and left rear wheel bearings greased. OK. |
03.06.2002 | 75500km | Forbro top and bottom lubricated. |
16.06.2002 | 75500km | Water pump rental lubricated. |
19.07.2002 | 76000km | Fuel filter changed. |
21.07.2002 | 76200km | Rear subframe greased + miscellaneous. |
19.08.2002 | 76800km | Left front wheel rent adjusted slightly. |
Lubrication of front bærekulge (left?). | ||
Lubrication of bottom wear balls (left?). | ||
Replacement washer and rubber bottom at right front stabilizer bar. | ||
02.09.2002 | 77100km | Water pump lubricated. |
25.10.2002 | 77400km | Rear subframe greased + gimbal at both ends. |
24.11.2002 | 77600km | Forbro bottom bullets lubricated. |
18.12.2002 | 77900km | Right front wheel top and bottom wear bullets lubricated. |
Rack tried gasketed top with spring and packing.
|
2003
Of the logbook shows that the following is carried out in the course of 2003:
10.01.2003 | – | Oil levels rearend OK. |
19.01.2003 | 78000km | Water pump lubricated. |
21.03.2003 | 78400km | New drive belts: Dynamo, air conditioning, Fan, Power steering. Take turns with (name and price mentioned in the log-book). |
04.04.2003 | 78500km | Front brakes vented, new brake pads. |
Bearings adjusted and lubricated. | ||
22.04.2003 | 78600km | Forbro carry balls at the top + bottom [smeared?]. |
30.04.2003 | 78600km | Rear subframe greased + cross-gimbal by rearend. |
02.05.2003 | 78600km | Petrol filter cleaned. |
New fuel hose to the filter. | ||
07.05.2003 | 78600km | The sight and approved (brake lines underbody cleaned) |
01.06.2003 | 78800km | Water pump lubricated. |
05.06.2003 | 78800km | Tracking wheel + 1/4 Rev. (characters for “counterclockwise”) right track rod (more spidsning). |
07.07.2003 | 79000km | Dyserens + cylinder head + a-or-other (???) |
07.08.2003 | 79350km | Oil change + filter + malycote 1300ml |
12.08.2003 | – | Water pump lubricated. |
30.08.2003 | 79500km | Forbro bottom bullets lubricated. |
02.09.2003 | – | Water pump lubricated. |
not published yet | 80000km | Rear subframe greased etc.
|
February 2008
4 new tyres 215/70WR15 Pirelli P4000 is mounted
Diff sealing changed, oil level checked
Brake mastercylinder changed
Oil and filter changed
2009
The Jaguar stays in the family
PBV inherits the car after his father, BBV, in 2009 by odometer 87.400 km.
In august 2010 the Jaguar dealership makes a major service using 36 hours on the car:
▪ Brakes inspected and repaired
▪ Front brake discs replaced
▪ Front calipers refurbished
▪ Front brake hoses and brake lines replaced
▪ Rear brake discs cleaned
▪ Brake fluid changed
▪ Front bump stops replaced
▪ Front anti roll bar links repaired (bushings replaced)
▪ Rear shock absorbers replaced
▪ Rear radius link arms replaced
▪ Rear anti roll bar repaired. Joints and bushings replaced
▪ Exhaust clamps replaced
▪ The vehicle inspected, and more.